NewsNorth Karnataka

8 Bidders in Race for Hubballi Airport’s New Terminal

HUBBALLI,Nov 24: As many as eight construction firms have submitted bids for the construction work of a new terminal building at Hubbballi Airport after Airports Authority of India opened technical bids last week.

The new terminal is aimed to have the capacity of handling 2,400 peak hour passengers with a total built-up area of 20,000 sq.m. The existing terminal of the Hubballi Airport was opened in December 2017 with a built-up area of 3,600 sq.m.

The terminal will be equipped with four aerobridges and its apron will be expanded to accommodate six code narrow-body aircrafts.

The following firms are in race to win the bid.

• Comt Constructions Pvt. Ltd.

• Girdhari Lal Constructions Pvt. Ltd.

• Harsh Constructions Pvt. Ltd.

• M.S. Khurana Engineering Ltd.

• Renaatus Projects Pvt Ltd

• URC Construction Pvt. Ltd.

• Vensa Infrastructure Ltd.

• Vishal Infrastructure Ltd.

Please follow and like us:
Pin Share

Leave a Reply

Your email address will not be published.

Back to top button
Close