News
Flyover At Chennamma Circle: Quality Of Mud Tested Before Work Begins

HUBBALLI: The quality of mud on the Sir Siddappa Kambli (Lamington) Road was tested, prior to the construction of the flyover at the Rani Chennamma Circle in the city.
The contract of the work on the flyover at a cost of Rs 322 crore has been given to Ram Kumar Construction Limited of Haryana. The company is conducting the mud testing as a part of the primary phase of the construction work.
National Highways divisional superintendent engineer Vasanth Naik told Vijayavani that there would be similar testing of mud quality along the route of the flyover and the final design of the flyover follows such testing.
Union Transport Minister Nitin Gadkari inaugurated the construction work on January 15.
